sports

calendars

board

menus

alumni

sitemap schools
Athletics Calendars Board
Menus Alumni Site Map Schools

Sunset Flag Football Tradition

OHP officers serve as referees and coaches for the flag football games at recess.

Butterfly Release

held at Washington ELementary School

http://www.altusschools.k12.ok.us/district/components/com_gk2_photoslide/images/thumbm/467903Flag_FootballTAB.jpg http://www.altusschools.k12.ok.us/district/components/com_gk2_photoslide/images/thumbm/412662Butterfly_Release_tab.jpg
/district/index.php/home/3/586 /district/index.php/home/3/587

Upcoming Events

Simplepie detected an error. Please run the compatibility utility.
The following Simplepie error occurred:
A feed could not be found at http://www.google.com/calendar/feeds/vroberts@altusschools.k12.ok.us/public/full?futureevents=true&sortorder=ascending&orderby=starttime&singleevents=true&hl=en-GB&

AHS-Archways-4A huge crane from Maahs Crane and Rigging towered over Altus High School on Monday, August 20, 2012, as construction workers installed the lintels on the arches that will lead from the student parking lot into the school’s new courtyard.

Students and teachers have already occupied the renovated classrooms in the south and west wings of the school, which were the last to be completed. A few finishing touches remain, though, before the two-year AHS construction and renovation project can be called ‘complete.’

When the masonry work on the archway is finished, workers will pour concrete from the archway to the student parking lot. They will also install a pull-down gate and doorways under the walkway that serves as the entrance into the courtyard. Inside the courtyard, brickwork lattice fences will be installed to hide the air conditioning units, and rails will be put around the new stage. Outdoor furniture is on order for the courtyard, and should be here soon, as well.

Inside the school, while the classrooms and offices are in use, the new library still awaits its custom shelving and furniture. Once that arrives, the books will be moved from the old library building.

School officials are in hopes that all of the final touches will be in place by mid-September, and they plan to open up the newly constructed Altus High School for a public tour/open house when the project is complete.

AHS-Archways-1

AHS-Archways-2

 

 
APS makes no endorsement, express or implied, of any links to or from its sites, nor is it responsible for the content of any linked sites.
banner4
logo

PAS allows parents to view their child's activities and achievements in real time. Parent@School will be active again on the first day of school.


Welcome to Altus Public Schools' Online Classroom. APSOC pushes through the concrete educational walls to empower Altus High School students and parents with a powerful 21st Century educational tool.

Your are currently browsing this site with Internet Explorer 6 (IE6).

Your current web browser must be updated to version 7 of Internet Explorer (IE7) to take advantage of all of template's capabilities.

Why should I upgrade to Internet Explorer 7? Microsoft has redesigned Internet Explorer from the ground up, with better security, new capabilities, and a whole new interface. Many changes resulted from the feedback of millions of users who tested prerelease versions of the new browser. The most compelling reason to upgrade is the improved security. The Internet of today is not the Internet of five years ago. There are dangers that simply didn't exist back in 2001, when Internet Explorer 6 was released to the world. Internet Explorer 7 makes surfing the web fundamentally safer by offering greater protection against viruses, spyware, and other online risks.

Get free downloads for Internet Explorer 7, including recommended updates as they become available. To download Internet Explorer 7 in the language of your choice, please visit the Internet Explorer 7 worldwide page.